SKY RAY High Quality Results, 15 Years Experience More

Star Towers, D4, Erbil, IRAQ info@sky-ray.com

MSC3 - Baghdad Power Project

About the project

  • PROJECT DATE: August, 2020
  • CLIENT: KPC
  • CATEGORY: IT solutions
  • ADDRESS: Erbil, Iraq

A huge power project has been completed in Baghdad for Asiacell company (Datacenter), we installed four diesel generators each “LionRock” 770 KVA capacity, all Gen-sets have been synchronized together and connected to the central power station room which contains 3-1500 Ampere ATS, which supply the datacenter with power. SkyRay technical team did a great job during the implementation with excellent quality, thanks to Asiacell for trusting us, SkyRay will continue in providing the best for our valued customer Asiacell.

Asiacell replaced old diesel generator with new LionRock generator which carry long warranty, to ensure long trusted power source for such critical datacenter.
our team was able to replace all generators and power cable without any interuption in power providing, by two step installation and power cutover.

40ft container havebeen used as power synchronization room which has been provided directly from 3Tech, all breaker and ATSs have been installed and ready to use.

      • Best quality

      • Trustable brand

      • Long warranty

    Technologies What We Used

    LionRock Power genset, Model LRO770 diesel generator set powered by Volvo diesel engine coupled with Leroy Somer alternator was used for generators set, 300mm HAS cable (best brand of cable) have been used for connecting the 4 generators with power panels.

    1-4-1
    73cfb34a-0341-4b1d-8e23-2418df80b0a3
    3422fb89-7163-480d-a167-4e01acd69bb4
    10